Polaris
C.O. Christian & Sons was selected to design and install all power, site lighting, equipment, and wire to Polaris’ new 950,000 square foot manufacturing facility in Madison, Alabama.
Customer
Polaris
Location
Madison, Alabama


The Advance Auto Parts 460,000 square foot distribution center in Lavergne, TN was completed in 2017 and is responsible for distributing parts and logistic services throughout the southeast.
C.O. Christian and Sons installed a new 300 amp service and re-fed an existing 2000 amp service to provide power throughout the warehouse. This building is now equipped with one 70 kW Emergency Generator, a 250 Amp Transfer Switch, Two Generator Docking Stations, and two Manual Transfer Switches. Also installed all power connections to the HVAC equipment, the fire alarm system, approximately 480 light fixtures and roughed-in all low voltage systems.
Advance Auto
LaVergne, Tennessee






C.O. Christian & Sons has been honored to provide electrical work on Lipscomb’s campus for over three decades. Since 2013, Lipscomb Academy has made significant upgrades to their athletic facilities and C.O. Christian has engineered and installed all power and lighting to these improvements.
Lipscomb Academy: Reese Smith Athletic Complex
Mustang Athletic Center (MAC)- Indoor Training Facility
Administrative Offices & Film Room
Football Field Lighting
Football, Baseball, & Track Locker Rooms
Baseball: Indoor Batting Cage
Weight Room
Sports Medicine Room
Concession Stand
Scoreboard
Ticket Booth
Lipscomb Academy Soccer Facility
Field Lighting to (2) Soccer Fields
Locker Rooms
Concessions Building
Lipscomb Academy
Nashville, Tennessee
102,841 sq. ft. Boutique Hotel
13 Stories
New 1600A Electrical Service
250 kW Emergency Backup Generator
400A 480 Volt Standby Power System
Power to (2) Stair Pressurization Fans
Wiring & Connection to (3) Elevators
Power to Kitchen Equipment (4) Different Stories
Mechanical Equipment Power
Specialty Vintage Lighting
LED Lighting
NFPA Fire Alarm System
Fairlane Hotel
Nashville, Tennessee

166,000 sq. ft. Food Distribution Facility
2000 Amp 480 Volt Electrical Service
400W Metal Halide Hibay Fixtures- FDA Approved
Exit/Emergency Lighting
Ammonia Compressors & Air Units Power
Ammonia Monitoring System Control Wiring
Temperature Sensor Control Wiring
-10 & -20 degree Freezer
34, 38, 40, & 50 degree Coolers
Dry Food Storage Area
70 Battery Charging Stations
Administration Office Electrical
Truck Maintenance Building
NFPA Fire Alarm System
60 kW Emergency Generator
Electrical Engineer: C.O. Christian & Sons Co., Inc.
Electrical Contractor: C.O. Christian & Sons Co., Inc.
Performance Food Group
Lebanon, Tennessee

20,000 sq. ft. Classroom Shell Buildout
7,500 sq. ft. Lobby Entrance Renovation
Interior Light Fixtures & Controls
Power & Connection to 30 Tons of HVAC Systems
Power & Connection to (2) 50 Gal Water Heaters
NFPA Fire Alarm System
Exit/Emergency Lighting
Electrical Engineer: C.O. Christian & Sons Co., Inc.
Electrical Contractor: C.O. Christian & Sons Co., Inc.
Otter Creek Kindergarten
Brentwood, Tennessee

Completed in 2015, this design/build project is a 118,000 square foot warehouse which C.O. Christian & Sons provided approximately 1500’ of underground primary, a new 3000-amp electrical service, all light fixtures, panels breakers and feeders.
Dana Way
Antioch, Tennessee


CKNA is a plastic fabrication company in Lewisburg, TN. C.O. Christian & Sons engineered and installed all electrical to the new 300,000 sq.ft. facility. In 2017, C.O. Christian also installed a 1500 Amp service, interior and exterior warehouse lighting, electrical panels for lighting, low-voltage receptacles, and battery charging equipment to their 45,000 sq.ft. expansion.
CKNA
Lewisburg, Tennessee



This project was the renovation of a 200,000 sq. ft. existing warehouse. Amazon now uses this building to serve as a fulfillment center and is responsible for sorting packages for their destination to increase delivery times.
C.O. Christian & Sons completed this design/build project in 2015 with the installation of all light fixtures, controls, receptacles, panels, and connections to all HVAC equipment. They also installed a new 100kW 480v generator, transfer switch, and a 30 kVA UPS.
Amazon
Nashville, Tennessee
Horton Group - Nashville Web Design & SEO + AI Search